Last Modified: May 29, 2024
Affected Product(s):
BIG-IQ Platform
Opened: Dec 27, 2021 Severity: 4-Minor
After a daylight savings event the schedule task is advanced or put back by one hour when it should not be.
Scheduled task moved one hour
This can happen in timezones without DST
The proper "start date" can be configured back under "Backup Schedule" options inside the affected backup schedule.
None