Last Modified: Oct 19, 2025
Affected Product(s):
F5OS F5OS-A, F5OS-C, Install/Upgrade
Fixed In:
F5OS-C 1.8.0, F5OS-A 1.8.0
Opened: Apr 12, 2024 Severity: 3-Major
BIG-IP tenant deployment fails after a F5OS reboot or after a downgrade/upgrade of F5OS. An error in platform.log is reported: "Error mapping SEP file. Unlinking. Disconnecting client." Tenant deploy status shows as Pending, with Phase reading "Insufficient memory on node, retrying tenant deployment" and Status showing "No enough memory available for tenant allocation."
The issue may lead to tenant deployment error due to insufficient memory on node.
Tenant deployment after a downgrade (1.3.2 ISO) and then back The system is rebooted
None
Fixed an issue preventing a tenant from starting due to insufficient memory.