Last Modified: Oct 19, 2025
Affected Product(s):
BIG_IP_NEXT(CM) Install/Upgrade
Known Affected Versions:
20.3.0
Opened: Sep 13, 2024 Severity: 2-Critical
The installation of BIG-IP Next Central Manager may fail with a “node not ready” status when there is high disk I/O latency.
The installation of BIG-IP Next Central Manager in High Availability mode will fail.
High disk latency, such as when using NAS-mounted disk storage, can cause the High Availability installation of the BIG-IP Next Central Manager to fail.
It is recommended to use low-latency block storage devices for local storage volumes on Virtual Machine (VM) instances.
None