Last Modified: Nov 22, 2021
Affected Product(s):
BIG-IP LTM
Known Affected Versions:
11.3.0
Fixed In:
11.3.0 HF9
Opened: Jun 28, 2013 Severity: 2-Critical
After data egresses, a datagram LB enabled flow, the flow lingers for the full timeout period (default 60). Under normal conditions, the flow is reaped.
Behavior can result in higher than expected flow counts.
Configure a virtual with a datagram LB enabled profile.
None.
Datagram LB enabled flows now timeout as expected.