Bug ID 621210: Policy sync shows as aborted even if it is completed

Last Modified: Sep 13, 2023

Affected Product(s):
BIG-IP APM(all modules)

Fixed In:
13.0.0, 12.1.2 HF1

Opened: Oct 07, 2016

Severity: 3-Major

Related Article: K73297185

Symptoms

After syncing a policy in a sync-only device group, the policy appears to be synced to the target successfully, however, the remote HA pair devices show status as canceled/aborted.

Impact

Sync status is displayed incorrectly, even after the sync was successful.

Conditions

It is not known exactly what triggers this condition. It was observed in a 4-device trust group consisting of 2 sync/failover groups and a single sync-only device group for all 4 devices. After the sync the status reported as cancelled/aborted.

Workaround

None.

Fix Information

Policy sync now shows as completed when it is completed.

Behavior Change

Guides & references

K10134038: F5 Bug Tracker Filter Names and Tips