Last Modified: Apr 11, 2023
Affected Product(s):
BIG-IP PEM
Known Affected Versions:
12.1.0, 12.1.0 HF1, 12.1.0 HF2, 12.1.1, 12.1.1 HF1, 12.1.1 HF2, 12.1.2, 12.1.2 HF1, 12.1.2 HF2, 12.1.3, 12.1.3.1, 12.1.3.2, 12.1.3.3, 12.1.3.4, 12.1.3.5, 12.1.3.6, 12.1.3.7, 12.1.4, 12.1.4.1, 12.1.5, 12.1.5.1, 12.1.5.2, 12.1.5.3, 12.1.6, 13.0.0, 13.0.0 HF1, 13.0.0 HF2, 13.0.0 HF3, 13.0.1, 13.1.0, 13.1.0.1, 13.1.0.2, 13.1.0.3, 13.1.0.4, 13.1.0.5, 13.1.0.6, 13.1.0.7, 13.1.0.8, 13.1.1, 13.1.1.2, 13.1.1.3, 13.1.1.4, 13.1.1.5, 13.1.3, 13.1.3.1, 13.1.3.2, 13.1.3.3, 13.1.3.4, 13.1.3.5, 13.1.3.6, 13.1.4, 13.1.4.1, 13.1.5, 13.1.5.1
Fixed In:
14.1.0
Opened: Dec 14, 2016 Severity: 3-Major
In Gy delayed binding mode, CCR-Us triggered by concurrent flows are blocked and PEM does not retry.
Quota management service will not be active for those concurrent flows.
In Gy delayed binding mode, concurrent flows hits another rating group before the CCA-I for the first rating groups comes back.
None
PEM now holds CCR-U requests for those concurrent flows and releases them after CCA-I comes back.