Last Modified: Sep 13, 2023
Affected Product(s):
BIG-IP PEM
Known Affected Versions:
12.1.0, 12.1.1, 12.1.2, 12.1.3, 12.1.3.1, 12.1.3.2, 12.1.3.3, 12.1.3.4, 12.1.3.5, 12.1.3.6, 12.1.3.7, 12.1.4, 12.1.4.1, 12.1.5, 12.1.5.1, 12.1.5.2, 12.1.5.3, 12.1.6, 13.0.0, 13.0.0 HF1, 13.0.0 HF2, 13.0.0 HF3, 13.0.1, 13.1.0, 13.1.0.1, 13.1.0.2, 13.1.0.3, 13.1.0.4, 13.1.0.5, 13.1.0.6, 13.1.0.7, 13.1.0.8, 13.1.1, 13.1.1.2, 13.1.1.3, 13.1.1.4, 13.1.1.5, 13.1.3, 13.1.3.1, 13.1.3.2, 13.1.3.3, 13.1.3.4, 13.1.3.5, 13.1.3.6, 13.1.4, 13.1.4.1, 13.1.5, 13.1.5.1
Fixed In:
14.1.0
Opened: Jan 27, 2017 Severity: 3-Major
Quota provided by the 2nd Gy CCA-u is ignored which can result in limiting the effective quota provided to a subscriber. This in turn can result in additional control plane traffic as additional Gy CCR-u's outlining quota threshold/exhaustion will be sent by PEM.
Potential service hit and increase in control plane traffic.
PEM with Gx and Gy sessions. The threshold against the provided quota should be a large percentage of the quota which would result in quota exhaustion before additional quota is provided by the OCS.
Mitigation: Configure the threshold to be a smaller percentage of the provided quota.
None