Last Modified: Apr 28, 2025
Affected Product(s):
BIG-IQ Applications
Fixed In:
6.0.1
Opened: May 21, 2018 Severity: 3-Major
Performing the "Sync" operation on an existing application does not update existing nodes with template node changes.
After following all prompts for "Sync", the LTM nodes used in the application do not have the changes made to the template nodes
When a node is changed on a template that is being used by an application, and you click the Sync button.
Manually modify nodes that were created from templates and use the typical deployment mechanisms.
None