Bug ID 978817: BIG-IQ DCD cluster upgrade from version before 6.0.1 to 8.0.0

Last Modified: May 29, 2024

Affected Product(s):
BIG-IQ Platform(all modules)

Opened: Jan 05, 2021

Severity: 3-Major

Symptoms

In BIG-IQ versions prior to 6.0.1, the device reboot timeout is set to 15 minutes, which may be insufficient for a DCD to reboot successfully. As a result, upgrading a BIG-IQ with DCD cluster from a version before 6.0.1 to version 8.0.0 might fail due to the DCD not coming up within the timeout.

Impact

Upgrading a BIG-IQ with DCD cluster from a version before 6.0.1 to version 8.0.0 might fail.

Conditions

Upgrading a BIG-IQ with a DCD cluster from a version prior to 6.0.1 to version 8.0.0.

Workaround

Upgrade the BIG-IQ DCD cluster first to version 6.0.1, then upgraded to version 8.0.0.

Fix Information

None

Behavior Change

Guides & references

K10134038: F5 Bug Tracker Filter Names and Tips